Simulation lawn construction process

Simulation lawn construction process

The artificial simulation lawn construction process is briefly summarized as six steps. The construction process is as follows: the bottom line of the painting - grass roll unrolling, trimming - bonding green grass (width) seams - determining the position of white lines and bonding white lines - injecting quartz sand - injecting rubber pellets - completion acceptance.

仿真草坪的施工流程

The following describes the specific process of artificial turf construction and the precautions for artificial turf construction in terms of engineering measurement and stakeout, lawn bonding process, and quartz sand paving process. First, engineering measurement and stakeout. When the artificial turf pavement is installed, when the turf is not in the site, the basic engineering is checked and accepted to ensure the cleanliness of the foundation site. If there is debris in the basic site, the basic site is cleaned to ensure the construction site is clean and construction quality.

Secondly, use a measurement tool (such as a steel ruler roll) to accurately measure the site size and control the error within the allowable range. If the size is different, modify it. After the site is measured accurately or the style of the drawings is perfect, the original roll of artificial turf will be laid neatly, and the original roll shape cannot be maintained. It must be laid flat.

Artificial artificial lawn bonding process construction process. Before artificial turf bonding, it is necessary to trim the edges and correct the edges of both sides of the lawn. There must be no rough surface to ensure smoothness. Then use a glue brush to apply glue to the bottom of the lawn. The glue thickness must be controlled, and the glue should be uniform. , In order to avoid the phenomenon of shedding; adhesion should be adhered to when the temperature and humidity conditions meet the standards, bonding should be aligned, there can be no dislocation phenomenon.

In addition, artificial turf non-woven laying, the arrangement direction and the artificial turf laying direction is a vertical angle, the angle must be 90 °C; non-woven fabric and non-woven fabric between the gap is small, as close as possible to rely on.

Then there is pressurization and curing, using a special rubber mallet to hit the bond to make it firm and the curing time is generally 3 days. Artificial turf construction environment temperature is controlled at 0-40°C, construction is prohibited in rain and snow weather; glue adhesion drying time is controlled within 10-15 minutes; lawn needs to be maintained during curing to avoid exposure to sunlight and water Dip and move to ensure that the turf is bonded to the best condition.

Quartz sand paving process: Quartz sand filling height is within 10mm of the remaining height of the lawn, the spreading speed should be uniform, and the quartz sand paving should be paved with the integral method concept. During the paving, the flatness and the control of the quartz sand filling amount must be ensured; The rubber particles are injected into the operation with the quartz sand injection.

仿真草坪的施工流程

The company is a professional company engaged in R&D, design and manufacturing of children's amusement equipment. The company's products are favored by new and old customers at home and abroad. The company produces children's slides, plastic toys, expansion equipment, children's furniture, fitness equipment and other teaching toys. Company official website: http://. Hotline.

The company dedicated to serve you!


Razor Brush

Razor Brush,Shaver Brush,Electric Shaver Brush,Electric Shaver Cleaning Brush

GUANGZHOU WEIDI TECHNOLOGY CO., LTD , https://www.weidirazor.com